Framework agreement with the Stadtentwässerung Celle focusing the on optimizing of the biological stage |
Germany |
2024 - ongoing |
Treatment of additional rainwater from the separate sewer system at the Emsdetten-Austum wastewater treatment plant |
Germany |
2024 - ongoing |
Simulation study for the recalculation of the Niederrad/Griesheim WWTP for interim expansion stages currently being planned and recalculation of the Sindlingen WWTP |
Germany |
2023 - ongoing |
Construction of a model and dynamic simulation of the Seevetal wastewater treatment plant with SIMBA# |
Germany |
2022 - 2023 |
Updating and calibration of the dynamic model of KA Oldenburg |
Germany |
2021 - 2022 |
Simulation study to estimate the effects of heat extraction in the main collector on the purification performance of the biological stage of the Steinhof wastewater treatment plant |
Germany |
2022 - 2023 |
Simulation for the representation of the solids distribution in the two aeration tanks when installing a membrane in the outer ring of the 2nd cascade, Wolfsburg |
Germany |
2022 |
Investigation into the integration of a COD discharge system (pre-treatment) at the Emsdetten-Austum wastewater treatment plant |
Germany |
2023 |
Potential analysis, support with application preparation for funding (according to municipal guidelines), conceptual design of retrofitting with pressurised aeration by means of dynamic simulations as well as renovation of the aeration systems and rehabilitation of the aeration basins - Husum |
Germany |
2021 - 2022 |
Consulting and engineering services for the development of a future-oriented sustainable waste water strategy for the waste water association Braunschweig |
Germany |
2021 - 2023 |
Updating and adapting the dynamic model of WWTP Oldenburg for use of the same in the research project |
Germany |
2020 - 2021 |
Carrying out a simulation study for WWTP Holdorf and Bösel for capacity constraints in case of future load increase |
Germany |
2020 - 2021 |
Carrying out a simulation study for WWTP Eschweiler and Langerwehe for capacity constraints in case of future load increase |
Germany |
2021 - 2022 |
Modeling-based feasibility study for the reconfiguration of wastewater and sludge treatment at the Lindau wastewater treatment plant, aqua consult GmbH |
Germany |
2020 |
Modeling in support of the planning of WWTP Düren as a subcontractor of aqua consult GmbH |
Germany |
2019 - 2022 |
Study on the influence of O2 and SS concentration on the nitrogen uptake of a sludgewater treatment plant with deammonification at WWTP Rodgau |
Germany |
2020 |
Modelling study of the wastewater treatment plant Wolfsburg – setup, calibration and validation of a dynamic model as well as model calculations to support the planning for the extension and retrofitting of an activated sludge stage (PE 120.000) |
Germany |
2020 - 2021 |
Matematical modelling of WWTP Wallenstadt to determine optimal denitrification volume |
Switzerland |
2019 |
Modelling study of the wastewater treatment plant Dietzenbach – setup, calibration and validation of a dynamic plant-wide model as well as model calculations to support the planning for the extension, or the retrofitting of an activated sludge stage (PE 50.000) |
Germany |
2019 |
Development of a module block and implementation of kinetic parameters for the dynamic simulation of a thermal pressure hydrolysis under the aspect of a holistic modeling of the sewage treatment plant Grevesmühlen |
Germany |
2018 - 2019 |
Modelling study of the wastewater treatment plant Oldenburg (240.000 PE) – setup, calibration and validation of a dynamic plant-wide model |
Germany |
2017 - 2018 |
Dynamic modelling of an anaerobic municipal digester with Co-Digestion at wastewater treatment plant Herrenhausen Hannover (500.000 PE) |
Germany |
2016 |